Show removal of a plant without a permit
- Bauen und Immobilien
- Anlagen, Waren und Stoffe
Procedure
You make the announcement in text form using the published form. Attach the required documents.
Submit the notification to the responsible lower building supervisory authority. If documents are missing or if there are other ambiguities, you will be asked to correct these obstacles to assessment. In this case, submit the missing or adjusted documents and/or the clarification.
The lower building inspection authority will review your notification. If the lower building inspection authority does not take any further building inspection action within one month of acknowledging receipt of the complete building documents, work can begin after the one-month period has expired.
In the case of buildings that are not free-standing, the stability of the building or buildings to which the building to be removed is attached must be assessed by a structural engineer within the meaning of Section 66 (2) of the Bremen State Building Code and proven to the required extent.
The removal shall be supervised by the structural engineer in building class 2 and in the case of non-detached buildings in building class 3 - to the extent necessary.
The confirmation of stability required in accordance with Section 61 (3) Sentence 4 of the Bremen Building Code or the required proof of stability shall be inspected by the building authorities in building classes 4 and 5.
§ Section 61 (3) sentences 4 to 6 of the Bremen Building Code do not apply insofar as the building is attached to buildings that are not subject to procedures.
Legal bases
- § 1 Kostenverordnung Bau (BauKostV)
- Bremische Bauvorlagenverordnung (BremBauVorlV)
- Bremische Verwaltungsvorschrift Technische Baubestimmungen (BremVVTB)
- Bremisches Gebühren- und Beitragsgesetz (BremGebBeitrG)
- Bremische Landesbauordnung (BremLBO)
More information
Building Activity Statistics Online
- The survey form for building permits or departures/disposals survey can be filled out online or printed out on the Building Activity Statistics Online (statistik-bw.de). The link to this can be found under "Further information" - "Where can I find out more?" - "Construction Activity Statistics Online."
Overview of legal bases
- You can also find a link to the overview of state and municipal legal bases under "Further information" - "Where can I find out more?" - "Overview of state and municipal legal bases" .