Construction/ substantial modification of installations in the 20 m strip of a flood protection system


Procedure

The attached application (see form) for an exemption under water law in accordance with §§ 74, 76 of the Bremen Water Act must be submitted to the water authority of the Senator for the Environment, Construction and Transport (see "Responsible body"). The following must also be submitted in triplicate

  • General plan with identification of the property
  • site plan
  • Building description
  • Floor plan and sectional drawing

Legal bases

More information

If the use or necessary modification of the flood protection system is significantly impaired by the use or utilization, the exemption may be revoked.