Construction/ substantial modification of installations in the 20 m strip of a flood protection system
- Umwelt und Klima
- Notlagen und Opferhilfen
If you have a justified reason to use the area of a flood protection facility up to 20 meters from its landward boundary for the construction or modification of a facility, you can apply for an exemption from the ban on the use of flood protection facilities under certain circumstances.
Basic information
§ Section 76 (1) of the Bremen Water Protection Act states that facilities of any kind may not be erected or significantly altered within 20 meters of the landward boundary of flood protection facilities. Under certain conditions, the water authority of the Senator for the Environment, Construction and Transport may grant an exemption on application. The party responsible for maintenance will be consulted.
Requirements
The water authority may grant an exemption from the prohibition upon request if
- the prohibition leads to an obviously unintended hardship in the individual case,
- the exemption is compatible with the interests of flood protection.
What documents do I need?
- Required documents for the construction/ substantial modification of installations in the 20 m strip of a flood protection system
- General plan with marking of the property
- Site plan
- Building specification
- ground plan and sectional drawing