Applying for partial approval for the construction and operation of an installation
- Unternehmensstart und Gewerbezulassung
- Anlagen, Waren und Stoffe
Procedure
The approval procedure requires a written application, which must be accompanied by the drawings, plans, expert opinions and explanations as well as other documents required to check the approval requirements.
- If your application is complete, it must be published together with the documents and then displayed for one month. In simplified approval procedures or if public participation is waived, there is no public display and no discussion meeting.
- At the latest at the same time as the public announcement of the project, the licensing authority shall request the authorities to be involved to submit their comments on the licensing requirements within one month.
- If the approval requirements are met, the authority examines whether there is a legitimate interest in the construction and operation of the sub-project.
- A preliminary assessment will determine whether there are no insurmountable obstacles to the construction and operation of the entire facility with regard to the partial approval requirements.
- You will receive notification of the approval or rejection of the partial project.
Legal bases
- Kostenverordnung der Umweltverwaltung (UmwKostV)
- § 10 Gesetz zum Schutz vor schädlichen Umwelteinwirkungen durch Luftverunreinigungen, Geräusche, Erschütterungen und ähnliche Vorgänge (Bundes-Immissionsschutzgesetz – BImSchG)
- § 8 Gesetz zum Schutz vor schädlichen Umwelteinwirkungen durch Luftverunreinigungen, Geräusche, Erschütterungen und ähnliche Vorgänge (Bundes-Immissionsschutzgesetz – BImSchG)