Applying for a permit under hazardous incident law for the construction and operation or modification of an installation that does not require a permit
- Anlagen, Waren und Stoffe
What deadlines must be paid attention to?
Before the system is installed, operated or modified.
How long does it take to process
6 to 7 months.
The competent authority must decide on a modification within six months and on the installation and operation within seven months.
What are the costs?
Not specified.