  • Applying for a permit under hazardous incident law for the construction and operation or modification of an installation that does not require a permit

Applying for a permit under hazardous incident law for the construction and operation or modification of an installation that does not require a permit


What deadlines must be paid attention to?

Before the system is installed, operated or modified.

How long does it take to process

6 to 7 months.
The competent authority must decide on a modification within six months and on the installation and operation within seven months.

What are the costs?

Not specified.