You are here:
  • Dienstleistungen
  • Apply for approval in the simplified procedure for an installation in accordance with the BImSchG (Federal Immission Control Act)

Apply for approval in the simplified procedure for an installation in accordance with the BImSchG (Federal Immission Control Act)


Are you applying for a permit for installations under the simplified procedure? Then you can obtain a permit from the competent authority for the construction and operation of installations of a certain type or scope without public participation.

Permits for installations of a certain type or scope can be issued in a simplified procedure. In these cases, the procedure is carried out without public participation.

You will receive a permit if you fulfill the obligations under the Federal Immission Control Act and the project does not conflict with any other public law regulations.

The cases in which a simplified approval procedure is possible can be found in the legal basis.

Requirements

  • You must prove that you will comply with the obligations of the Federal Immission Control Act when constructing and operating a plant.
  • No other public law regulations or occupational health and safety concerns stand in the way of the project.

What documents do I need?

  • ELiA forms
    • (Electronic immission control application), available on the website of the Trade Supervisory Authority of the State of Bremen
  • Required drawings, plans or expert opinions
  • Explanatory notes on the system
  • Other documents
    • If necessary, ask the competent authority