Apply for approval in the simplified procedure for an installation in accordance with the BImSchG (Federal Immission Control Act)
- Unternehmensstart und Gewerbezulassung
- Anlagen, Waren und Stoffe
Are you applying for a permit for installations under the simplified procedure? Then you can obtain a permit from the competent authority for the construction and operation of installations of a certain type or scope without public participation.
Basic information
Permits for installations of a certain type or scope can be issued in a simplified procedure. In these cases, the procedure is carried out without public participation.
You will receive a permit if you fulfill the obligations under the Federal Immission Control Act and the project does not conflict with any other public law regulations.
The cases in which a simplified approval procedure is possible can be found in the legal basis.
Requirements
- You must prove that you will comply with the obligations of the Federal Immission Control Act when constructing and operating a plant.
- No other public law regulations or occupational health and safety concerns stand in the way of the project.
What documents do I need?
- ELiA forms
- (Electronic immission control application), available on the website of the Trade Supervisory Authority of the State of Bremen
- Required drawings, plans or expert opinions
- Explanatory notes on the system
- Other documents
- If necessary, ask the competent authority